Cherchez une société par raison sociale, ticker ou ISIN, puis ouvrez sa fiche.
Performance
Sur 100 € facturés en 2025, 84 € partent en coût des ventes, 12 € en frais d’exploitation et 2 € en impôts, intérêts et divers. Il reste 3 € de bénéfice net.
Le nombre d’actions n’a pratiquement pas bougé depuis 2021 : 84,7 M titres à la clôture 2025, contre 84,7 M.
Elecnor, S.A. engages in the development, construction, and operation of projects and services in Spain and internationally. It operates through three segments: Services, Projects, and Concessions and Own Projects. The company offers electricity distribution, telecommunications, and infrastructure maintenance; construction, operation, and maintenance of energy generation and transmission infrastructure; and promotion, financing, investment, and management of energy transmission and generation assets. It also provides electricity, power generation, maintenance, efficiency energy, telecommunications and systems, railways, gas, facilities, construction, water, environment, and natural resource activities. In addition, the company offers distribution and transmission networks, substations, transformer stations, and live-line work; public lighting; wind farms, solar photovoltaics, power generation plants, and self-consumption; catenary, traction substations, signaling, and interlocking, and communications; construction and rehabilitation of non-residential buildings; electricity and instrumentation, air conditioning, fire protection, ventilation, automation and control, plumbing and sanitation, security, public address and sound, and comprehensive installations; hydraulic works, water treatment plants, and environmental works. Elecnor, S.A. was incorporated in 1958 and is based in Madrid, Spain. Elecnor, S.A. operates as a subsidiary of Cantiles XXI, S.L.
En 2025, l’entreprise a comptabilisé 110,7 M € de bénéfice et laissé 374,6 M € en caisse une fois l’exploitation payée et les investissements faits, soit 338 € de trésorerie pour 100 € de bénéfice.